Planning conditions and hedges in Gravesend: what a landscape condition on your permission actually binds you to.

Planning permission for an extension, outbuilding or new development in Gravesend or the wider Gravesham borough often comes with a landscape condition requiring you to retain a boundary hedge, plant new hedging along a specified line, or protect existing vegetation during construction. Many people read these conditions once and then forget them. Removing a hedge that a condition requires you to keep is a breach of planning control under the Town and Country Planning Act 1990, and Gravesham Borough Council can take enforcement action against it. The question before any hedge work on a site that has had planning permission is not just whether the hedge is in a conservation area or carries a Tree Preservation Order: it is also whether a planning condition says it must stay.

What the law says

Section 70 of the Town and Country Planning Act 1990 provides that a local planning authority may grant planning permission subject to conditions as it thinks fit. That is a wide power, and landscape conditions are one of the most commonly used results of it. A typical condition requires the applicant to retain all existing hedges and boundary planting along specified boundaries, to carry out replacement planting of any hedge that is removed or dies within five years, and not to carry out tree or hedge works other than those shown on the approved drawings. The condition may also require a landscaping scheme to be submitted and approved before work starts: that is a pre-commencement condition, and it is enforceable independently of the main works.

Section 171A of the Town and Country Planning Act 1990 defines "breach of planning control" to include failing to comply with any condition or limitation subject to which planning permission has been granted. This matters because it means removing a conditioned hedge is not a civil dispute between neighbours: it is a breach of the planning permission granted by Gravesham Borough Council, and the council's enforcement powers apply.

Two enforcement tools are directly available for condition breaches:

The enforcement time limit was changed by the Levelling-up and Regeneration Act 2023, which amended section 171B of the TCPA 1990. Since 25 April 2024, the enforcement time limit in England is a single period of ten years for all breaches of planning control, including breaches of conditions. The previous four-year immunity period for operational development has been abolished for breaches occurring on or after that date. The ten-year rule already applied to breaches of conditions before the 2023 Act, so for a landscape condition breach, the effective time limit has always been ten years, and that remains unchanged.

Does a planning condition override a Tree Preservation Order or conservation area rule?

No: the systems are independent. A hedge or tree can be subject to a planning condition, a TPO, a conservation area notice requirement under section 211 of the TCPA 1990, and the nesting-season criminal prohibition under the Wildlife and Countryside Act 1981, all at once. Meeting one does not discharge the others. If work is proposed to a conditioned hedge that is also in a conservation area or carries a TPO, all relevant consents and notices are needed before any work starts.

How to check and act on a landscape condition: four steps

Step 1: Locate the original planning permission and read every condition

Every planning permission granted by Gravesham Borough Council includes a schedule of conditions. Older permissions may be in paper form at the property; all permissions granted since the introduction of the Planning Portal are searchable on Gravesham Borough Council's online planning register using the application reference number, the address or the postcode. When you find the decision notice, read the full schedule of conditions, not just the main approval letter. Look for any condition that refers to: landscaping, soft landscaping, hard landscaping, boundary treatment, hedgerows, existing vegetation, tree protection, or replacement planting. The wording varies between applications, so a condition may use any of those terms.

If you bought the property after the planning permission was granted, the conditions run with the land, not with the original applicant. The obligation binds you as the current owner or occupier of the site. Check your conveyancing documents and Land Registry title register for any landscape or planning condition entries, and ask your solicitor to confirm the current position if the title reveals an old permission you have not seen the conditions for.

Step 2: Understand what the condition actually requires

Landscape conditions fall into several distinct types, and the obligation they create differs between them:

Step 3: If the hedge has already been removed or damaged

If the conditioned hedge has been removed, cleared or substantially damaged before this check was made, the position is a live breach of planning control. The ten-year enforcement window means the council can still take action for up to ten years from the date the breach occurred. The practical steps are:

  1. Read the condition carefully and confirm that it does require the hedge to be retained. A condition that required a landscaping scheme to be approved, but does not explicitly require retention of the existing hedge, may be a pre-commencement condition only, which is a different type of breach.
  2. Contact Gravesham Borough Council's planning enforcement team to understand whether the breach has been registered and what voluntary action the council would accept. Proactively engaging with enforcement, including offering to replant to the original specification, is treated more favourably than waiting for a notice to be served.
  3. Consider whether applying for retrospective consent under section 73 (see below) or a fresh minor material amendment application is the appropriate route. Retrospective applications are not guaranteed to succeed, but they are a legitimate part of the planning system.

Do not carry out any further works to the site that might constitute a breach while enforcement correspondence is open. Additional breaches complicate the position and can affect the council's decision on whether to proceed to formal enforcement action.

Nesting-season law applies independently of any planning condition

Section 1 of the Wildlife and Countryside Act 1981 makes it a criminal offence to intentionally destroy or damage an active bird's nest or disturb a bird while it is in or near an active nest. This applies regardless of whether work is otherwise authorised by a planning condition, a section 73 variation, or any other planning consent. The main risk period is 1 March to 31 August. Even if a planning condition specifically authorises hedge removal, any work carried out during that window that disturbs an active nest is a separate criminal offence. Before any hedge removal or significant cutting in that period, a check by a competent ecologist is the practical standard. The penalties are an unlimited fine per offence and, for aggravated offences involving Schedule 1 species, a potential custodial sentence of up to six months.

Step 4: Applying to vary or remove a condition under section 73

Section 73 of the Town and Country Planning Act 1990 allows an applicant to apply to a local planning authority for permission to carry out development without complying with conditions subject to which a previous planning permission was granted, or to vary those conditions. This is the formal route for changing a landscape condition that you consider unreasonably restricts what you want to do with a hedge.

Key points about the section 73 route:

A section 73 application is distinct from a "discharge of conditions" application. If a pre-commencement condition requires a landscaping scheme to be submitted for approval, the correct route is a discharge of conditions application (section 96A TCPA 1990), not a section 73. The two routes exist for different purposes: discharge of conditions satisfies the condition by providing the required details; section 73 changes or removes the condition itself.

How Gravesham Borough Council handles landscape condition enforcement

Gravesham Borough Council operates under a planning enforcement strategy that prioritises cases by seriousness and public interest. Removal of a conditioned hedge in a conservation area or in a location that was specifically protected because of its biodiversity or landscape contribution is treated as a higher-priority breach than damage to a replacement planting condition on an otherwise complete development. The council's enforcement team can be contacted through the planning enforcement pages of the council's website.

In practice, landscape conditions are among the more commonly breached conditions in any local authority area, partly because they operate after the main development is complete and partly because many owners have not read all the conditions attached to the permission. I see it directly on jobs in Gravesend and Northfleet: a hedge that appears to have been removed during a renovation has sometimes been conditioned as retained on a permission granted years earlier. Confirming the planning history before any hedge removal, particularly on sites in DA11 or DA12 that have had extensions or conversions in the past decade, is a straightforward check that avoids a difficult enforcement conversation later.

How this interacts with other protection regimes

A hedge subject to a landscape condition may also require a separate consent or notice under:

Not sure whether your planning permission has a landscape condition?

Before any hedge removal or significant cutting on a site that has had planning permission, I recommend reading every condition attached to that permission. If you want a second pair of eyes on the planning history or a quote for work that stays on the right side of both the conditions and the nesting-season law, call 07763 100 477, send a WhatsApp to the same number, or email hello@gravesendhedges.co.uk with the address and a photo of what you are thinking about.

Sources: Town and Country Planning Act 1990, sections 70, 171A, 171B, 172, 187A and 73; Levelling-up and Regeneration Act 2023, section 115 (commencement 25 April 2024); Wildlife and Countryside Act 1981, section 1; Gravesham Borough Council, Planning Enforcement Strategy (2022); Planning Portal, "Discharge or vary a planning condition" guidance; GOV.UK, "Planning enforcement" guidance; East Devon District Council, "Trees subject to planning conditions" guidance note (checked against current sources).